Filter by
view all
Over the years, this bathroom endured dampness due to improper materials and inadequate ventilation, resulting in issues across its external walls. Rosco & Perlini undertook a comprehensive redesign, sourcing materials and installing them in this Grade II listed property. Cork insulation was applied to external walls, complemented by insulated lime plaster and lime wash to facilitate breathability. Additionally, modern amenities such as a water softener, underfloor heating, and advanced extract systems were integrated. This renovation harmoniously blends historic preservation with contemporary fixtures and fittings.
Completed in 8 wks
Hertfordshire SG12
The property underwent a significant extension at the rear, which included the addition of a roof terrace and a lead-clad loft conversion. A garden, pond and outbuilding were also designed and constructed by Rosco & Perlini. Reclaimed London yellow stock bricks were used along with lime mortar to seamlessly match the original Victorian building. Additionally, timber sash windows with Slimlight double glazing were installed, replicating the appearance of the original single-glazed sashes while providing improved thermal performance and noise reduction.
Completed in 20 wks
Walthamstow E17
A traditional approach to damp proofing was employed to restore this property to its former glory. The external walls had become saturated due to the use of incorrect materials. The failed cement mortar pointing was removed and replaced with lime mortar, allowing the walls to dry naturally. The timber sash windows were renovated, and minor repairs were made to the roof and flashings. After giving the walls sufficient time to dry, internal repairs were carried out, followed by decorating.
Completed in 8 wks
Chelsea SW3
Previous poor repairs and neglect had left this Grade II listed Chruch roof in a poor state. The building, which had been converted into flats, was experiencing numerous leaks. Many of the original 'Westmorland slates' had been replaced with cheap, inferior products. Rosco & Perlini were tasked with sourcing reclaimed Westmorland slates to carry out sympathetic repairs and prevent further leaks.
Completed in 8 wks
Ealing W13
coming soon
coming soon